Microsoft Datacentre Truganina

Kapitol Group

Microsoft Datacentre Truganina

06/12/2022

14/04/2023

Kapitol Group engaged BRC Piling & Restorations for the construction of a 120,000m2 facility for Microsoft in Truganina, Victoria. BRC provided a comprehensive range of services, including bored piles, soil nails, and sheet piles. The project faced challenges such as variable subsurface conditions and strict environmental controls. BRC ensured high-quality standards through daily records maintenance, load and integrity testing, and compliance with the client’s safety management system. The project was successfully completed within the specified timeframe.
Plant & Equipment
Plant/Rig Tooling/Attachments Quantity
SR40 piling rig SoilMec 1
SR100 piling rig SoilMec 1
SR50 piling rig SoilMec 1
sr516 piling rig SoilMec 1
SWMDH24A piling rig Sunward 1
SWMD15H piling rig Sunward 1
Excavators – 3t 6t, 14t, 20t, Long Reach Excavation buckets 5
Furphy Water Cart 500 (litres) 1
Water Cart 10,000 (litres) 1
Elevated boom lift 60 ft Height/reach (metres) 1

Our projects

  • Geelong V-Line Rail Works

    The South Geelong to Waurn Ponds Duplication Project involved the expansion of the train track alignment in South Geelong on behalf of Djilang Alliance. BRC Piling & Foundations provided services such as bored piles, soil nails and sheet piles. The project faced challenges due to difficult ground conditions and the proximity of fully operational rail corridor. BRC successfully installed 19 bored piles, totaling 10m in depth, along with 332m³ of concrete and 70t of steel for cages. The project adhered to strict government regulations and maintained a focus on quality, safety and environmental compliance.
    Read more: Geelong V-Line Rail Works
  • Microsoft Datacentre Truganina

    Kapitol Group engaged BRC Piling & Restorations for the construction of a 120,000m2 facility for Microsoft in Truganina, Victoria. BRC provided a comprehensive range of services, including bored piles, soil nails, and sheet piles. The project faced challenges such as variable subsurface conditions and strict environmental controls. BRC ensured high-quality standards through daily records maintenance, load and integrity testing, and compliance with the client’s safety management system. The project was successfully completed within the specified timeframe.
    Read more: Microsoft Datacentre Truganina
  • Hampton Hill

    Lowe Group engaged BRC to deliver piling and foundation works to support the Hampton Hill residential development in suburban Melbourne. Comprising 30 high-end residences and two luxury penthouses when finished, the site was located close to Port Phillip Bay and involved variable (and contaminated) subsurface conditions for the three level, 1500m2 basement construction. BRC delivered high quality works on time, on budget and without incident – including strict environmental controls to minimise noise, dust and vibrations for local residents and businesses.
    Read more: Hampton Hill